Originally, the Jai Hind metro station was prepared being elevated. Nonetheless, the AAI objected that the elevated stretch up towards the airport may well pose a danger to plane, Hence the route was even further reworked along with the station was shifted underground, 150 m from the Airport terminal building. They https://landenpzbee.wssblogs.com/33414758/railway-recruitment-kolkata-rrb-group-d-32000-vacancy-pdf